Multi-level ceiling from gypsum board with own hands

Why have two or three tiers become so popular lately? Everything is very simple: for rooms of sufficient size - this is a great way to get complicated backlighting, to achieve the depth of the design of the room, and to make the accents you need. Most likely you think that installing multi-level ceilings from gypsum cardboard with your own hands is a difficult task. In fact, the process though laborious, but it is quite feasible.

Gypsum plasterboard multi-level ceilings with their own hands

So, we already have a ready simple ceiling, now we will turn our own hands into a multi - level suspended ceiling .

  1. First, on paper, we mark out all the prospective fixtures. After that, we calculate the dimensions of the future design.
  2. Now directly on the ceiling, mark the position of the frame to mount the second part.
  3. We begin installation of multi-level ceilings from plasterboard with our own hands according to the intended position. In our case, these are boards of square and rectangular cross-section.
  4. To the wall, we nail the beam at the required level, thus marking the width of the box. To the long guide we nail the visor. We make sure that its lower edge is at the level of the wall beam.
  5. On the inside of the visor we attach the guide.
  6. Since we are assembling a multi-level ceiling from gypsum board with our own hands to get a complex light solution, at this stage we will work on laying cables and mounting the bases of luminaires.
  7. Now we measure the tape measure, as far as the filing for laying the LED tape will act.
  8. It's time to make a multi-level ceiling lining with your own hands.
  9. Next, fix a sheet of plywood, to which we will attach the LED backlight.
  10. For lighting fixtures we cut out the places for installation.
  11. At the edge of the visor, fix the bead under the tape.
  12. You can make the final skin of a multi-level ceiling, mounted by yourself.
  13. On the first ceiling, cut out the place under the chandelier.
  14. It remains only to walk through the putty at the seams, to mount the lamps. And to nail the decorative wooden border.

Work on a multi-level ceiling made of plasterboard with their own hands is completed.