How long does the flooring fluid dry?

The floor is a great way to level the floor base. And among the liquid coatings there are several types. Namely: polyurethane floor, which is able to withstand almost any load and mechanical impact; cement-containing floors, having a simple construction and easy enough to install, as well as epoxy floors, which include polymeric resins and mixtures that are resistant to chemical attack.

However, when choosing, many people want to know how long the bulk of the floor dries. This is important especially for production facilities that do not want to interrupt the process for a long time. But in residential premises, if the repair is also carried out in a short time, this characteristic plays a major role.

Which sex to choose?

Knowing how much the floor must dry is also necessary because the finish of the floor is used for the next base coat. If you take general data, then until complete drying takes two to six days. Although it all depends on the structure. For example, cement-containing requires more time. And their cost is low, so they are used in the construction of garages, economic and production buildings.

Polyurethane is a fairly quick-drying bulk floor. It is used more often in living quarters. You can walk about it in about ten hours. A complete drying takes place after two days. Resilience and stability to this coating is imparted to synthetic resins. Well, full load polyurethane floor can be given on the fifth day.

If the repairs take place in an apartment or apartment building, it is important to know exactly how long the flooring dries so that the owners can correctly calculate their time and money.

In the market of building materials a large assortment of such coatings. And you do not get lost, since each manufacturer indicates the packaging time of drying. More precisely, a definition is given, after how many hours it will be possible to walk on the surface.

There is also the concept of "congealing". This definition shows when the compound seizes, and minor effects are not afraid of it. Here it is necessary to wait about three hours, but here it is not recommended to walk on the "frozen" surface. And in a room with high humidity you can face the fact that the floor does not dry. Therefore, observe the installation rules, and this - the humidity and air temperature, it is necessary.